CONTRACT
DOCUMENTS:
The term "contract documents" is used to describe
all of the documents needed to build a project. Typically these
include the plans, specifications, general conditions and the
contract for construction.The contract for construction and
methods of job/cost management are discussed in a separate article.
Because every project is different and every owner has a different
set of expectations and requirements, every set of contract
documents will be different. Some may be very lengthy and others
may be short.
The plans are the primary documents because they convey the
visual description of what is expected. The specifications represent
the description of the project through the written word and
convey information that may not be clearly shown on the plans.
Sometimes the design information on the plans is repeated in
the specifications for clarity. Together, the plans and the
specifications become the major document needed to complete
the contract for construction between the owner and the builder.
My philosophy is to provide the documents required by the owner
to meet the individual need. It is not always necessary that
all of the items listed below be completed prior to start of
construction. The following list describes the major components
that are involved in a complete set of plans followed by a definition
of the specifications.
Plot
Plan:
Information needed to start the plot plan is usually taken from
the survey that is often furnished to the buyer of a property
when the property is purchased. It can usually be found in the
closing document package. The purpose of the plot plan is to
show how the structure fits on the property, the distance to
the property lines, the building setback requirements and relationships
to any easements or other property encumbrances. It also includes:
Site Drainage Notes: Shows changes needed to make sure
water drains to the appropriate places on the site, straying
away from the building and keeping the water flow from adjacent
property.
Site Utilities: Shows where electrical, gas, and sewer
lines are located and how they are to be modified to fit the
new plan. Indicates septic tanks, if any, electrical service
connections, sewer connections as well as gas meters and lines.
Access: Verifies that access to the building is maintained
to the building and indicates where problems of access may be
encountered during construction as well as any new curb cuts
or other site related access issues.
Slope: Placement and overall design of the building may
depend a great deal on the slop if it is significant.
Orientation: The lot orientation to the sun combined
with the slope is considered in building design so this information
is indicated on the site plan
Impervious cover calculations: Calculations are shown indicating
the total changes to the structure, driveways, patios and porches.
Most areas around Austin have some kind of impervious cover
limitations. Building permitting usually requires that this
information be posted on the plans. If the proposed building
exceeds these limitations, modifications to the footprint should
be considered.
Floor Plan:
Defines the size and placement of the individual rooms and the
elements within the rooms as well as traffic flow, dimensions,
placement of windows, cabinets and furniture are all set up
here. Plans are often sketched as ideas are developed and as
the plan matures into more detail. it is usually drawn at 1/4"
to 1 ft. scale depending on the size of the project and the
information to be conveyed.
Exterior elevations
Describes the building from the outside and starts to provide
the 3rd dimension to the building. Usually 2 or more views are
required. The most obvious is the front elevation where much
of the style of the house is established. These exterior views
also tells us a great deal about the construction of the roofs,
the development of the roof plan takes place with development
of the elevations. The connection points for the roof ridges
and valleys are established with a combination of these views.
Roof Plan
During the development of the floor plan, the roof plan must
be considered. It is a mistake to allow a floor plan to develop
without consideration for the way the roof will fit the plan
especially in remodeling where the new plan must connect to
an existing roof condition. The type of roof depends on the
style of the house, so this must also be considered. Eventually,
the roof plan is overlaid on the floor plan until it matches,
then coordinated with the elevations for accuracy. Once all
views are matched, we proceed to other views. Any time there
is a change to the plan, the elevations and the roof plan are
changed to match.
Section(s):
A section helps us see how a room will look from the inside,
how the ceiling levels may change from room to room, how beams
and joists will match and how the attic and roof will work together.
Many times the interior elevations of the rooms are developed
from drawing these sections. Section cut locations are selected
according to the need to see certain portions of the structure
in more detail, to explain to the owner and the builder how
the structural components and spaces are configured and to establish
heights of wall plates and changes in floor elevations.
Typical Wall Section:
A larger scale detailed wall section can now be developed from
the smaller sections. It describes the combination of details
of the wall construction, how the roof connects to the wall,
how the wall connects to the foundation and how the foundation
connects to the ground as well as other information regarding
insulation and wall sheathing material combinations.
Details:
The extent of the details to be shown on any given set of plans
depends on the nature of the structure to be built and the amount
of information that needs to be conveyed. Some buildings are
simplistic in nature and require only the basic details and
others are very intricate and require more. In general the more
detailed we make the set of drawings the less questions the
contractor will have in the bidding process and the fewer change
orders will be needed during construction.
Electrical Plan:
Many times there are so many switches and fixtures in certain
rooms that a separate plan is required to show them all. In
other cases, these elements can be shown on the main floor plan.
It is a judgement call about which plan is most appropriate.
The electrical plan is a good place to show the fixture schedule
which identifies each fixture, type and model number if available.
In other cases, the fixture schedule is located in the specifications
which can be changed more frequently as necessary to reflect
final changes without having to reprint a new set of plans each
time.
HVAC Plan:
HVAC stands for Heating Ventilating and Air Conditioning. Providing
a separate plan for this is not always needed but in larger
custom homes where zoning of the spaces are required it is a
good idea. In my opinion, the most important thing is to make
sure the HVAC system is designed by a qualified professional.
Some equipment installers are inclined to oversize the equipment
to take care of contingencies rather than make sure the duct
system is appropriately designed to maximize the efficiency
of the units as they are designed to work. If an a/c system
is so oversized that it cycles on and off too often, conditions
are created that create a good environment for mold to grow
and energy to be needlessly consumed.
Roof Framing Plan:
It is a good idea to include a roof framing plan if the structure
requires changes in roof joist, rafter systems and connections
that include open beams and higher ceiling combinations. Questions
can arise during construction that require larger structural
members that were originally in the bid which causes an unexpected
increase in costs. If there is a roof framing plan included,
the engineer will also be responsible for verifying that everything
drawn is correctly sized, placed and connected securely.
Floor Framing Plan:
The is much the same as the roof framing plan. It is not required
if the foundation is concrete, but should be included for 2-story
buildings. Once again, not all contract documents include the
framing plan if the structure is relatively simple in shape
and size.
Foundation Plan:
The foundation plan may describe a concrete slab plan or a pier
and beam plan or a combination of both depending on the structure
and the site conditions. This plan is used by the structural
engineer to provide additional structural detailed drawings
and calculations. A foundation plan is drawn for concrete slabs,
pier and beam and combinations of both to describe the architectural
preferences.
Engineering Plan(s):
After the Architectural plans are near completion, they are
sent to a structural engineer who will examine them, do the
necessary calculations and draw the plans, sections and details
as needed. In most cases a separate sheet(s) of drawings are
provided indicating these structural requirements and these
pages are stamped and sealed by the engineer. These pages are
then inserted into the package of drawings where they then become
a part of the contract documents. In more complex projects other
engineers and consultants may be utilized such as civil engineers
for site problems and electrical engineers.
Interior Elevations:
These elevations are often drawn at a larger scale than the
floor plans to show more detail. The will show the detailed
face of the cabinets, counters and upper cabinets. They include
notes regarding the types of cabinets, trim and shelving.
Door Schedule:
When there are several doors involved in the project it is better
to list each door by number and refer to them on that detailed
schedule which will provide more detailed information about
the type of door, hardware, locks and other notes which help
describe each situation. This schedule may be placed directly
on the plans or in the specifications.
Window Schedule:
Much the same as the door schedule for the same reasons.
Room Finish Schedule:
Many times the finishes of the floors, walls and ceilings are
simple enough to note them on the plans alone. When the finishes
are more complex and change from room to room, it is best to
describe the finishes on a schedule that shows how each wall,
floor and ceiling is to be finished in each room listed.
Specifications Short Form:
Specifications in the "short form" are intended to
provide general information regarding how the builder is to
provide his service and helps the owner make sure some basic
information that is not shown on the plans can be conveyed into
the contract documents. Some issues might be the hours of operation,
how to accommodate owner live-in situation, dust control, use
of utilities on site and information about when and how payments
are to be made. Much of this document can be copied directly
into and become a part of the final contract for construction
between the owner and the builder.
Specifications with Details:
For residential construction whether new or remodeling, the
additional detail provided is specific to the job being done.
It will include names and model numbers of specific materials,
paints and fixtures. It may also include very specific information
about how and to what standards certain materials may be applied
during the work. All other required specific information not
included in the plans and the short form specifications will
be included here.
Contract for Construction:
This is the document between the owner and the contractor which
refers to the plans and specifications to describe the work
to be done, how it is to be done and when payments are to be
made as the work progresses. A good contractor and a good contract
are vital to a well built project with a minimum of problems
during the course of the work.
Final Note:
No matter how hard we try, no set of contract documents will
be 100% complete. There will always be decisions to be made
during the construction process. It is important that the owner
and the builder set up good communication channels and work
together to use the contract documents to assist them in completing
the work as intended. All change orders should be done in writing
and sketches should be included to describe those changes when
appropriate even if it takes a little time. Verbal changes can
lead to misunderstandings which quickly can become amplified
as they are built and expenses start adding up.
The amount and extent of what elements are to be included in
the final set of contract documents vary greatly from project
to project. Some can be very simple and others require all of
the above. It is only possible to determine just how much will
be needed after examining the needs of each project. There is
no more good reason to over draw a project than for doing less
than what is needed. It is fair to say, that the more detail
provided in the final set, there will be less room for errors,
omissions and misunderstandings which is almost always interpreted
to mean a better building with less cost and fewer headaches
in the process.
|